![Beam Crack Filling System Solution Waterproofing](https://www.vacbuildcare.com/wp-content/uploads/2024/03/1.jpg)
Step 1
Improve the long-term performance of concrete with the addition of CRYSTON IW+ range of crystalline based durability enhancing products into wet concrete before placement.
![Check Icon](https://www.vacbuildcare.com/wp-content/uploads/2024/02/check.png)
Reduces permeability by 50% to 90%
![Check Icon](https://www.vacbuildcare.com/wp-content/uploads/2024/02/check.png)
Drastically improves performance against chloride ion penetration & migration.
![Check Icon](https://www.vacbuildcare.com/wp-content/uploads/2024/02/check.png)
Significantly reduces shrinkage cracks.
![Check Icon](https://www.vacbuildcare.com/wp-content/uploads/2024/02/check.png)
Prevents long-term migration of water through concrete through prolonged formation of crystals within the concrete matrix.
![Waterproofing hole Filling](https://www.vacbuildcare.com/wp-content/uploads/2024/03/WhatsApp-Image-2024-03-07-at-6.04.12-PM.jpeg)
Step 2
Treat all construction joints, tie-rod inserts, honeycombs, and visible cracks.
![Check Icon](https://www.vacbuildcare.com/wp-content/uploads/2024/02/check.png)
Eliminate all weak joints and potential failure points.
![Check Icon](https://www.vacbuildcare.com/wp-content/uploads/2024/02/check.png)
Usage of the best fit technique – grouting or sandwiched systems of repair mortars with bond coats and crystalline based topcoat or both.
![Waterproofing Concrete Mumbai](https://www.vacbuildcare.com/wp-content/uploads/2024/03/WhatsApp-Image-2024-03-07-at-6.15.50-PM.jpeg)
Step 3
![Check Icon](https://www.vacbuildcare.com/wp-content/uploads/2024/02/check.png)
For Water Retaining Structures.
- Water based Epoxy putty + Epoxy top coat
- Eliminates plaster/tiling
- Long lasting & easy to maintain
![Check Icon](https://www.vacbuildcare.com/wp-content/uploads/2024/02/check.png)
For Terraces and Podiums.
- Heavy duty undercoat system with protection layer
- Protective screed in slope